Measuring mooring risk after a new capstan at Portsmouth International Port
Updated: 5 days ago

In July 2026, we returned to Portsmouth International Port to carry out a follow-up MOVA assessment at Berth 2, where a new capstan has been installed.
Our baseline assessment in November 2025 measured mooring risk across Berths 2 to 5 and helped identify Berth 2 as a priority for an engineering control. Since then, the port has installed a capstan there, and its Quay Assistants have taken part in a biomechanist-led technique workshop.
Installing a control is only half the job. The other half is checking what it changed. Quay Assistants wore MOVA sensors while mooring vessels with the new capstan, so we could compare stern and spring lines against the November 2025 baseline. Alongside physical risk, we also looked at how the change affects the task day to day.
This is what repeat measurement makes possible: not a one-off snapshot, but evidence before and after each decision, so every improvement can be verified and the next one targeted.
Thank you to Kathryn Angus, Chris Hatter, the Berthing Masters and the Quay Assistants at Portsmouth International Port for welcoming us back and supporting the work.
You can’t reduce the risk you can’t see, and you can’t be sure you’ve reduced it until you measure again.